The last I heard it was making its way through Porirua Council with a possible start date in August 2025 (Anecdotally)
Its proposed to be 30-36 unit complex. In my opinion it’s a lot of intensification for two combined sections.
The last I heard it was making its way through Porirua Council with a possible start date in August 2025 (Anecdotally)
Its proposed to be 30-36 unit complex. In my opinion it’s a lot of intensification for two combined sections.